Next Job Phase
With this node you can set the next Job states and set the workable on hold here until the state of the linked Job has changed.
This node is a combination of the nodes Update Job, Wait for Job State Change and Route on Job State.
The node checks job states on start, and if it matches one of the next states, then it will continue without waiting.
It has the following configuration options:
- Next states: here you can define the next Job states. For every state, an output connector is created for the node.
- Also allow other states: if you select this checkbox, Job states that are not specified are also allowed.